Construction Photos

Figure 1: Site conditions before construction, notice erosion of slope.
Figure 1: Site conditions before construction, notice erosion of slope.
Figure 3: The Infiltration Trench was outlined and excavated with a backhoe.
Figure 3: The Infiltration Trench was outlined and excavated with a backhoe.
Figure 5: Washed crushed stone filling the bed.
Figure 5: Washed crushed stone filling the bed.
Figure 7: 6x6" timbers were used to outline the Trench and a small concrete pad was poured.
Figure 7: 6x6" timbers were used to outline the Trench and a small concrete pad was poured.
Figure 2: First a retaining wall was constructed to prevent future erosion.
Figure 2: First a retaining wall was constructed to prevent future erosion.
Figure 4: Once completed, the excavation was lined with a geotextile fabric.
Figure 4: Once completed, the excavation was lined with a geotextile fabric.
Figure 6: Installation of perforated distribution pipe.
Figure 6: Installation of perforated distribution pipe.
Figure 8: Completed Infiltration Trench.
Figure 8: Completed Infiltration Trench.